
GLOBAL MODULARS

FACTORY-BUILTPRE-SET OR CONFIGUREDSITE-DELIVERED
DELIVERED TO:
- EUROPE
- AFRICA
- NORTH AMERICA
- SOUTH AMERICA
- CARIBBEAN
- MIDDLE EAST
- ASIA
BUILT IN OUR FACTORY,CHOSEN FROM PRE-SET MODELSOR CONFIGURED FOR YOU,DELIVEREDTO YOUR SITE.
Services
Design & Engineering
FROM A PRE-SET MODEL OR YOUR OWN PLAN TO SHOP DRAWINGS.
Financing
FINANCING ARRANGED WITH HEARTH, FIXED MONTHLY PAYMENTS.
Foundation & Site Prep
FOUNDATIONS, UTILITIES AND ACCESS, READY FOR DELIVERY DAY.
Turnkey Development
ONE CONTRACT FROM FACTORY TO KEYS.

THE FACTORY

Our own production facility. Every module leaves it finished.
34,587
SF PRODUCTION FLOOR
450,410
SF SITE
7
HOUSE MODELS · 320 TO 1,920 SF
PRE-SET MODELS.OR YOURS.



TRIO
960 SQFT
- 2 FLOORS
- 3 BEDROOMS
- 2 BATHROOMS
- BALCONY 300 SF · ROOF 320 SF
LEAD TIME · up to 12 weeks

QUATTRO
1,280 SQFT
- 1 FLOOR
- 4 BEDROOMS
- 2 BATHROOMS
- FRONT DECK · ROOFTOP DECK
LEAD TIME · up to 12 weeks



HEX HIGH TECH
1,920 SQFT
- 2 FLOORS
- 3 BEDROOMS
- 3 BATHROOMS
- DECK 458 SF · BALCONY
LEAD TIME · up to 12 weeks
Process
90%
FEWER VEHICLE MOVEMENTS
50%
FASTER
90%
LESS WASTE
67%
LESS ENERGY

01 · FACTORY
MODULES ARE BUILT AND FINISHED INDOORS.
02 · THE SCHEDULE
Sitework and factory production run in parallel — the schedule is the argument.

03 · THE FOUR-PHASE MODULAR PROCESS
THE FOUR PHASES, ILLUSTRATED.
DESIGN · ENGINEERING · PERMITS
We adjust the design and engineering, then file for permits. Work starts once you sign the contract and pay the downpayment.
SITE & FOUNDATION + FACTORY PRODUCTION
Site preparation and foundation work run on your lot while your modules are built in the factory — two tracks, one schedule.
TRANSPORTATION & CRANE PLACEMENT
Modules are engineered to withstand the lift. They travel finished, and a crane sets them onto the foundation footprint in sequence.
INSTALLATION & FINISHES
Connections, final installation and finishes — through to keys. The completed building is hard to tell apart from conventional construction.
FOUNDATION WORK AND FACTORY PRODUCTION RUN IN PARALLEL. CONVENTIONAL BUILDING RUNS THE SAME TWO STEPS IN SEQUENCE, WHICH TAKES LONGER.