Skip to content

GLOBAL MODULARS

Row of dark modular bungalows lit at dusk over water
MODULAR & OFF-SITE CONSTRUCTION

FACTORY-BUILTPRE-SET OR CONFIGUREDSITE-DELIVERED

DELIVERED TO:

  • EUROPE
  • AFRICA
  • NORTH AMERICA
  • SOUTH AMERICA
  • CARIBBEAN
  • MIDDLE EAST
  • ASIA

BUILT IN OUR FACTORY,CHOSEN FROM PRE-SET MODELSOR CONFIGURED FOR YOU,DELIVEREDTO YOUR SITE.

Services

Workers assembling steel-framed modules inside the production hall

THE FACTORY

Workers assembling steel-framed modules inside the production hall

Our own production facility. Every module leaves it finished.

34,587

SF PRODUCTION FLOOR

450,410

SF SITE

7

HOUSE MODELS · 320 TO 1,920 SF

PRE-SET MODELS.OR YOURS.

UNO — model render

UNO

320 SQFT

  • 1 FLOOR
  • 1 BEDROOM
  • 1 BATHROOM

LEAD TIME · up to 12 weeks

DUO — model render

DUO

640 SQFT

  • 1 FLOOR
  • 2 BEDROOMS
  • 1 BATHROOM
  • ROOF TERRACE 620 SF

LEAD TIME · up to 12 weeks

TRIO — model render

TRIO

960 SQFT

  • 2 FLOORS
  • 3 BEDROOMS
  • 2 BATHROOMS
  • BALCONY 300 SF · ROOF 320 SF

LEAD TIME · up to 12 weeks

QUATTRO — model render

QUATTRO

1,280 SQFT

  • 1 FLOOR
  • 4 BEDROOMS
  • 2 BATHROOMS
  • FRONT DECK · ROOFTOP DECK

LEAD TIME · up to 12 weeks

PENTA — model render

PENTA

1,600 SQFT

  • 2 FLOORS
  • 3 BEDROOMS
  • 3 BATHROOMS
  • TERRACE 320 SF

LEAD TIME · up to 12 weeks

HEX — model render

HEX

1,920 SQFT

  • 1 FLOOR
  • 4 BEDROOMS
  • 2 BATHROOMS
  • DECK 520 SF

LEAD TIME · up to 12 weeks

HEX HIGH TECH — model render

HEX HIGH TECH

1,920 SQFT

  • 2 FLOORS
  • 3 BEDROOMS
  • 3 BATHROOMS
  • DECK 458 SF · BALCONY

LEAD TIME · up to 12 weeks

CUSTOM

320 TO 1,920 SQFT

  • YOUR PLAN
  • YOUR SITE

CONFIGURED TO YOUR PLAN.

Process

90%

FEWER VEHICLE MOVEMENTS

50%

FASTER

90%

LESS WASTE

67%

LESS ENERGY

  1. Workers assembling steel-framed modules inside the production hall

    01 · FACTORY

    MODULES ARE BUILT AND FINISHED INDOORS.

  2. CONTRACT + DOWNPAYMENT01 DESIGN · ENGINEERING · PERMIT FILING02 SITE PREPARATION & FOUNDATION02 FACTORY PRODUCTION — SAME WEEKS03 TRANSPORT · CRANE PLACEMENT04 INSTALL · FINISHKEYS

    02 · THE SCHEDULE

    Sitework and factory production run in parallel — the schedule is the argument.

  3. Illustrated four-phase modular construction diagram: design, engineering and permit filing, site preparation and foundation with factory production running in parallel, transport with crane placement, then installation and finishes

    03 · THE FOUR-PHASE MODULAR PROCESS

    THE FOUR PHASES, ILLUSTRATED.

  1. DESIGN · ENGINEERING · PERMITS

    We adjust the design and engineering, then file for permits. Work starts once you sign the contract and pay the downpayment.

  2. SITE & FOUNDATION + FACTORY PRODUCTION

    Site preparation and foundation work run on your lot while your modules are built in the factory — two tracks, one schedule.

  3. TRANSPORTATION & CRANE PLACEMENT

    Modules are engineered to withstand the lift. They travel finished, and a crane sets them onto the foundation footprint in sequence.

  4. INSTALLATION & FINISHES

    Connections, final installation and finishes — through to keys. The completed building is hard to tell apart from conventional construction.

TURNKEY LEAD TIME FROM 12 WEEKS AFTER PRODUCTION START. MODULES SIT SIDE BY SIDE, END TO END OR STACKED, SO YOU CAN CHOOSE THE LAYOUT AND ADD TO THE HOUSE LATER.

FOUNDATION WORK AND FACTORY PRODUCTION RUN IN PARALLEL. CONVENTIONAL BUILDING RUNS THE SAME TWO STEPS IN SEQUENCE, WHICH TAKES LONGER.