Skip to content

GLOBAL MODULARS

Row of dark modular bungalows lit at dusk over water
MODULAR & OFF-SITE CONSTRUCTION

FACTORY-BUILTSTANDARD OR CUSTOM PLANSITE-DELIVERED

DELIVERED TO:

  • EUROPE
  • AFRICA
  • NORTH AMERICA
  • SOUTH AMERICA
  • CARIBBEAN
  • MIDDLE EAST
  • ASIA

HOMES AND VILLAS.OFFICES AND SCHOOLS.HOTEL ROOMS.A MODULAR APPROACHTO DIFFERENT USES.

Services

Workers assembling steel-framed modules inside the production hall

PRODUCTION FACILITY

Workers assembling steel-framed modules inside the production hall

34,587

SF PRODUCTION FLOOR

450,410

SF SITE

2,142

SF OFFICE SPACE

SEVEN HOME MODELS.FIND YOUR LAYOUT.

DUO — model render

DUO

640 SQFT

  • 1 FLOOR
  • 2 BEDROOMS
  • 1 BATHROOM
  • ROOF TERRACE 620 SF

LARGE KITCHEN AND LIVING AREA

TRIO — model render

TRIO

960 SQFT

  • 2 FLOORS
  • 3 BEDROOMS
  • 2 BATHROOMS
  • BALCONY 300 SF · ROOF 320 SF

PRIMARY SUITE · LAUNDRY

QUATTRO — model render

QUATTRO

1,280 SQFT

  • 1 FLOOR
  • 4 BEDROOMS
  • 2 BATHROOMS
  • FRONT DECK · ROOFTOP DECK

LARGE KITCHEN AND LIVING AREA

PENTA — model render

PENTA

1,600 SQFT

  • 2 FLOORS
  • 3 BEDROOMS
  • 3 BATHROOMS
  • TERRACE 320 SF

LAUNDRY · PANTRY

HEX HIGH TECH — model render

HEX HIGH TECH

1,920 SQFT

  • 2 FLOORS
  • 3 BEDROOMS
  • 3 BATHROOMS
  • DECK 458 SF · 2 BALCONIES

PRIMARY SUITE · HOME OFFICE

CUSTOM PLAN

MODULE LAYOUT

  • SIDE BY SIDE
  • STACKED

DISCUSS YOUR LAYOUT AND ADDITIONAL MODULES.

Contact us to discuss production timing, delivery and the scope of your project.

Process

  1. Workers assembling steel-framed modules inside the production hall

    01 · MODULE PRODUCTION

    MODULES BUILT FOR TRANSPORT AND CRANE PLACEMENT.

  2. CONTRACT + DOWNPAYMENT01 DESIGN · ENGINEERING · PERMIT FILING02 SITE PREPARATION & FOUNDATION02 FACTORY PRODUCTION — SAME WEEKS03 TRANSPORT · CRANE PLACEMENT04 INSTALL · FINISHKEYS

    02 · PARALLEL WORK

    FOUNDATION WORK AND FACTORY PRODUCTION PROCEED TOGETHER.

  3. Illustrated four-phase modular construction diagram: design, engineering and permit filing, site preparation and foundation with factory production running in parallel, transport with crane placement, then installation and finishes

    03 · FOUR PHASES

  1. DESIGN · ENGINEERING · PERMITS

    Design and engineering adjustments, followed by permit filing. The process begins after the contract is signed and the downpayment is made.

  2. SITE & FOUNDATION + FACTORY PRODUCTION

    The site and foundation are prepared while the modules are manufactured in the factory.

  3. TRANSPORTATION & CRANE PLACEMENT

    The modules travel to site and a crane places them onto the foundation.

  4. INSTALLATION & FINISHES

    The modules are joined, with connections, final installation and finishes completed on site.

MODULES CAN SIT SIDE BY SIDE, END TO END OR STACKED. ADDITIONAL MODULES ALLOW THE LAYOUT TO EXPAND LATER.

TELL US ABOUT YOUR SITE AND INTENDED USE SO WE CAN DISCUSS THE WORK YOUR PROJECT NEEDS.